We picked our floor and bathroom wall tile today. We are going with a neutral beige on the floors and walls in the bathroom, but we are adding some 1 inch glass and stone accent tiles in the bathroom. The glass tiles will go very well with the paint I have picked out.
The kitchen is going well also. My sweet husband put in the faucet last night and is now running the plumbing for the dishwasher. I have put in most of the shelf and drawer liner and cleaned all the dust from the cabinets. The microwave/vent hood is all set and as soon as the tile is installed we can move the fridge and range in.
As for moving day, we are still a ways off but my estimate of October is still the plan. It will be much cooler to move by then as well.
Comments